Scope of Work

General Construction

  • Demo: remove toilet (keep for re-install), remove shower completely, remove shower ceiling, 
  • Remove mirror
  • Raise ceiling in shower
  • Install shower door once constructed. 

Tile

  • Install large format tile on bathroom floor
  • Shower
    • Large format tile on walls
    • 1 recessed shelf

Sheetrock/Texture

  • Install new ceiling covering in shower
  • Patch wall and texture to match once mirror is removed

Carpentry

  • Misc trim work on baseboards, etc.

Paint

  • 2 colors (one for walls and one for trim, base, crown, door.) Prep and paint. 
  • Paint vanity and wall cabinet

Plumbing

  • New valves and trim kit in shower

Electrical

  • Add light in shower
  • Replace bathroom vent/light  

HVAC

  • none

Finishing Touches

  • Hang new mirror
  • Install toilet paper holder and towel rods.