Scope of Work

General Construction

  • Demo: remove vanity (keep in good condition), mirror (keep), light fixture above sink, toilet (keep), glass shower door (keep), PROTECT TUB, tile in shower, floor, keep tub/shower fixtures
  • PROTECT TUB with blankets, tape, plastic, etc...
  • Install freestanding vanity

Tile

  • Floor: remove existing tile and install new underlayment and tile
  • Shower: remove tile, install cement board and new tile using bullnose or pencil tile on edge

Sheetrock/Texture

  • Option 1: remove wallpaper, patch/texture
  • Option 2: paint directly over wallpaper

Carpentry

  • Reinstall base after floor is installed

Paint

  • 2 colors (one for walls and one for trim, base, crown, door.) Prep and paint. 

Plumbing

  • Vanity: Hookup new faucet and drain
  • Toilet: reset toilet after floor is in
  • Shower: Reinstall trim kit

Electrical

  • Replace light above vanity

HVAC

  • none

Finishing Touches

  • Hang 1 mirror
  • Install toilet paper holder and towel rods